Session 4B - Water Flow to a Stream 2
Add the source at the soil surface:
Project Manager Button “Copy”
Name: plume2
Description: Water flow to a stream - 2
Button “Open”
Main Processes
Heading: Water flow to a stream - 2
The BOUNDARY Module:
Menu: View->Stretching->In Y Direction: 0.2
- Initial Condition:
Toolbar Button: “'Initial Condition”
Import initial condition from previous example:
Menu: Condition->Initial Condition->Import Pressure
Select folder "plume1", file h.out.
Select layer: 7 - Water Flow Boundary Conditions:
Toolbar Button: “Water Flow BC''”
Zoom on the soil surface with x=16-17 m.
Select "Constant pressure", select at the top nodes between x=16 and 17 m, specify h=0 cm.
Menu: View->View All
Save
Close
Execute HYDRUS
(Execution time on P5-300 = 544)
OUTPUT:
Menu: Post-Processing -> Graphical Display of Results Pressure heads