• login
  • register
  • lost your password?

Session 1A

  • sitemap
  • mail to me
  • add to bookmarks
  • Home
  • News
  • Programs
  • Support
  • Services
  • Downloads
  • About us
  • Contacts
advanced search
  • Home
  • Programs
  • Hydrus-2D
  • Tutorials
  • Session 1A
  • Session 1B
  • Session 1C
  • Session 2A
  • Session 2B
  • Session 3A
  • Session 4A
  • Session 4B
  • Session 4C
  • Session 4D
  • Hydrus-2D Book

Home / Programs / Hydrus-2D / Tutorials / Session 1A

Session 1A - Infiltration of Water Into a One-Dimensional Soil Profile

Project Manager

  Button ”New”
  Name: Infiltr1
  Description: One-Dimensional Infiltration of Water
  Button ”Open”

Main Processes

  Heading: One-Dimensional Infiltration
  Button ”Next”

Geometry Information

  Geometry Type: Rectangular
  Button ”Next”

Time Information

  Final Time: 1
  Initional Time Step: 0.0001
  Minimum Time Step: 0.000001
  Button ”Next”

Print Information

  Number of Print Times: 10
  Button "Select Print Times": 0.1, 0.2 ….., 1
  Button ”Next”

Water Flow - Iteration Criteria

  Water Content Tolerance: 0.0005
  Pressure Head Tolerance: 0.5
  Lower Time Step Multiplication Factor: 1.25
  Lower Limit of the Tension Interval: 0.001
  Upper Limit of the Tension Interval: 200
  Button ”Next”

Water Flow - Soil Hydraulic Model

  Button ”Next”

Water Flow - Water Flow Parameters

  Catalog of Soil Hydraulic Properties: Loam
  Button ”Next” (If the program crashes at this moment and HYDRUS2D.exe is older than September 1999, please contact either IGWMC or USSL for the new version. The crash was caused by erroneous memory allocation.)

Rectangular Geometry

  Vertical Rectangular Dimension: 100
  Number of Horizontal Columns: 51
  Button ”Next”

Space Discretization

  Button ”Next”

The BOUNDARY Module:

Menu: View->Stretching->In x-direction: 0.1

  1. Initial Condition:
    Menu: Condition->Initial Condition->Pressure Head:
    Button ”Select” - Select two nodes at the soil surface
    Button ”Set Value”: 0
  2. Boundary Condition:
    Toolbar Button: ”Water Flow BC”
    Button ”Constant Pressure”, Select two nodes at the soil surface, Specify h=0
    Button ”Free Drainage”, Select two nodes at the bottom of the soil profile
  3. Observation Nodes:
    Toolbar Button: ”Observation Nodes”
    Button ”Insert”, Select nodes at z-coordinates of 20, 40, 60, 80, 100 cm

Menu: File->Save Data
Menu: File->Close

Execute HYDRUS
(Execution time on P5-300 = 11s)

OUTPUT:

Menu: Post-Processing->Observation Points:

  Pressure Heads
  Water Contents

Menu: Post-Processing ->Boundary Information->Boundary Fluxes:

  Constant Boundary Flux
  Free Drainage Boundary Flux

Menu: Post-Processing ->Boundary Information->Cumulative Fluxes:

  Constant Boundary Flux
  Free Drainage Boundary Flux

Menu: Post-Processing ->Mass Balance Information:

Menu: Post-Processing ->Graphical Display of Results

  Pressure heads

  Toolbar Button: ”Spectral Maps”
  Toolbar Button: ”Values along a boundary   between two selected points”

  Water contents
  Velocities

 

 

Copyright © 2008, PC-Progress s.r.o. | powered by NetGenium